Nigam Project :-
Urban Growth Management
  • Development of New Singrauli Township Along Waidhan Sidhi Road.
  • Development of District Centre Devra including Facilities of Star Hotel , Shopping Mall , Cinema Halls , Multilevel Parking.
  • Development of Grain Market in Bargavan.
  • Development of Sabji Mandi in Ganyari.
  • Construction and beautification of Entry and exit gates and provide following facilities .
    • Development of Police Post 8 in Numbers.
    • Restaurant 8 Numbers.
    • Weigh-Bridge
    • City Entry Gates 8.
  • Revision and Notification of Master plan.
  • Preparation of Zonal and local area Development plans.
  • Establishment of Singrauli development Authority
Strategies & Projects
  • In-situ up-gradation of existing slum housing.
  • In Situ Upgradation of 37 Slums.
  • Construction of 21 km road in slums.
  • Provision of Street Lights (1000).
  • Improvement and Provision of low cost Innovative Housing 6843 houses for the poor.
  • Provision of housing of 2664 (BPL families ) of EWS Housing under IHSDP Schemes.
  • Provision of water connection in 6840 Houses.
  • Provision of 41 km drainage network in slums.
  • Provision 6840 sewer connection.
  • Provision of 684 community Toilets in slums.
  • Provision of 388 Dustbins in Slums.
  • Door to door collection in slums.
  • Skill Development training (Jute Craft, Candles Making, Aggarwati making)
Strategies & Projects
  • Implementation of Following works Under the UIDSSMT.
    • Construction of 3 Intake Wells Morwa and Waidhan area on Bijur and Rihand Dam.
    • Construction of Treatment plant of 11 MLD for Morwa .
    • Construction of treatment plant of 121 MLD.
    • Construction of Clear Water of Sump Well 2 in Numbers.
    • Construction of 15 OHT .
    • Construction of 30 Underground reservoir tank.
  • Development of Water Supply Network.
    • Laying of network 300 mm 12.5 km.
    • Laying of network 200 mm 18km.
    • Laying of network 150 mm 36km.
  • Strengthening of Existing water supply system.
    • Leak detection, rectification & repair of old pipe lines of existing 32 km Network.
    • Develop the secondary Sources of water by cleaning existing 77 wells and 22 ponds.
  • Provision of water supply in Villages of planning area.
    • Provision of check Dams on Kachan and Bijur River 10 (Nos).
  • Water Conservation awareness Program
Projects for Sewerage
  • laying down 115 km sewerage network as per proposed scheme.
    • Laying of trunk network (600 mm dia) – 4000m.
    • Laying of network (400 mm dia) – 14000m.
    • Laying of network (250 mm dia) – 60000m.
    • Laying of network (150mm dia)- 37000m.
  • Construction of 9 Aerated lagoon ponds as per proposed sewerage scheme 102.
  • Formation of Interceptor Drain along Rihand Reservoir for Emergency Purpose .
  • Development of CETP of 10MLD.
  • Rehabilitation of existing Public toilets (22 nos) and.
  • construction of new public toilets (90 Numbers ) in market and other major public places.
  • Provide the septic tank sewer system for all 75 villages of the planning area.
  • Awareness generation programmes regarding sanitation.
Projects for Drainage
  • Up gradation of existing drainage facility.
    • Provision of drains along the both side of the existing roads 492.
    • Upgradadtion of existing kuccha type 70 km Drains .
    • Covering all open drain 158 Km .
  • Preparation of drainage master plan for city.
  • De-silting of all drains .
  • Tree plantation along Kachan and Bijur River.
  • Community Awareness Program For Rain water Harvesting
Projects for Solid Waste Management
  • Development of scientific land fill site as per Standard of MSW 2000.
  • Provision of 2600 Community Bins future requirement existing Requirement 400 @ 500 population.
  • Provision of hh bins@ 1 per 2 households.
  • Provision of 5 Dumping and Segregation and Transfer Stations in Morwa, Waidhan, Jyant , Vindhya nagar and Bargavan.
  • Requirement of Vehicles.
    • J.C.B=1.
    • Dumper =1.
    • Dumper Placer 2.
    • Hydraulic Tractor Trolley =6.
    • Gully vacuum emptier.
    • Wheel borrower.
    • Waste Collection tricycles 180.
  • Community awareness Program For RRR
Projects for urban Trasportation
  • Road.
    • Improvement of existing internal roads 294 Km.
    • convert 30km Kuccha Road in to pucca road .
    • Construction of by pass to shaktinagar to kachan Bridge 12KM.
    • Construction of by-pass Bargavan Railway Bridge to pindertali to chatka Naka 7km.
  • Parking.
    • Development of Multi storey Parking ( 4 In Nos) Capacity of 400 (E.C.S) Total Built Up area of all floor 2 completed till 2015.
    • Provision of Auto rickshaw and Taxi stand (30 Nos).
  • Public Transport System .
    • Provision of Bus Stop Present Requirement (162 Nos) , future Requirement (800).
    • Bus Fleets-50 present Requirement , 150 future Requirement (CNG based ).
  • Pedestrian Facilities .
    • Sub Ways -4.
    • Skywalks-6.
    • Zebra Crossing all major ponts.
  • Traffic Management.
    • Provision of Signages (all major points).
    • Provision of CCTVs Camera 5 gates .
    • Provision Traffic signal in hospital chowk , ambedkar chowk, Majan Mod , College chorrah , Shukla Mod , CTI Chowk , Masjid Chowk.
    • Improvement of existing Geometry of all Junction.
    • Provision Traffic Police post 8.
    • Provision of 2800 Streets lights
  • Road Widening and Improvement
    • Waidhan Sidhi Road 15m to 45 (23.5km ) Bargavan to Majan Mod .
    • Madha road 6m to 30m (30km) Parsona to Mada Caves .
    • Ghuritaal road 4 m to 20 m (13km) College Chorrah to Jaynt .
    • Ambedkar Road Imrovement Ganyari road (3.8Km) 10 m to 15m Ambedkar Chowk to Ganyari .
    • Thana Road 5m to 20m (3.2Km) .
    • Tiara Road 5m to 60m (6km) .
    • Removal of encroachments along the roads and construction/ repair of footpaths (near bus stand , tulsi marg , Near Masjid Road , navjiwan Bihar ).
  • Bus Stand & Terminals .
  • Construction of ISBT in Parsona as per Master Plan .
  • Improvements of Local Bus stand in Morwa, (improved Existing Bus Stand, ) Waidhan ( Improved Existing) Vindhya Nagar ( improved Existing ).
  • Construction of Transport Nagar one in Morwa As per master plan .
  • Construction of transport nagar in Tel gavan.
  • Flyovers 4 in Nos.
Projects for Education
  • Provision of primary School (present gap 68) future Requirement 520.
  • Provision of sr. secondary schools (present Gap 21 ) Future Requirement 173.
  • Development of education hub in Navgarh 100 acre .
  • Provision of Toilets , Electricity , and Play ground in existing 90 Nos schools